BMS Optimisation
In the 'Optimisation projects' course, we discuss topics related to optimisation that are not directly relevant to any specific control system (e.g., chilled water). You will not succeed in optimisation without learning this stuff.
Introduction
Version control: Optimisation course
Disclaimer
Document Downloads
M&V: Introduction to M&V
M&V: Plan 1
M&V: Plan 2
M&V: How far should we go?
M&V: How else does M&V help you?
PDM: Introduction (ChatGPT)
PDM: Why is Peak Demand Management Important?
PDM: How much could PDM save? - Part 1
PDM: How much could PDM save? - Part 2
PDM: Whole building vs systems
PDM: Pre-cool vs Capacity limiting
PDM: Grid and retailer coordination
PDM: Peak Demand Prediction (machine learning)
PDM: Peak Demand Management vs Optimal Start
PDM: Visualisation (graphics, alarms, trends, reports)
PDM: Revenue Stream
PDM: New construction vs existing buildings strategy
PDM: Whose fault is it that we do not have PDM?
PDM: Your call to action
Low-hanging Fruit: Introduction
Low-hanging Fruit: Strategy
Low-hanging Fruit: Run system reports
Low-hanging Fruit: Time Schedules
Low-hanging Fruit: Optimal Start
Low-hanging Fruit: Recommissioning
Low-hanging Fruit: Check for hunting control loops
Low-hanging Fruit: Check for incorrect setpoints
Low-hanging Fruit: Incorrect demand control ventilation
Low-hanging Fruit: Critical sensors
Low-hanging Fruit: Software issues
Low-hanging Fruit: Revenue streams
Low-hanging Fruit: Your call to action
You Did It !